Pool Deck Surfacing
A Barrie pool deck spends four months wet and seven months frozen, and Barrie Rubber Surfacing covers that concrete or interlock with poured rubber surfacing that seals the cracks, keeps its grip when soaked, and rides out the winter without splitting. The old deck is not removed. It becomes the base, which is why the work takes days rather than weeks. The work is insured from start to finish.
View Pool Deck Surfacing